WASTE TO ENERGY

This is a sector which Logik entered due to recent changes in the energy market and the growing environmental imperative to address climate change. Details of a current project are:

Weighbridge Road
Deeside Industrial Estate

Project Details: 15 acre site with planning permission for anaerobic digestion, currently undergoing phase 1 of detailed design.

Client: Logik WTE Limited in joint venture with Eqtec Plc.

GDV: £200m

Completion: 2025/2026

A former Gaz de France CHP site before being acquired by Flintshire Council and remediated, we acquired the site through our Logik WTE subsidiary in 2019. Having originally obtained planning permission for a waste to energy plant using anaerobic digestion technology, we have now partnered with Eqtec Plc, the aim-listed advanced digestion technology to secure planning permission for its proprietary advanced gasification process to be built at the site.

This is our first collaboration with Eqtec Plc but we have now signed a collaboration agreement with Eqtec to bring forward a number of sites across the country.